Tecnomatix Plant Simulation Tutorial File

But then, chaos. The welding robot took 45 seconds. The painting robot after it took only 20 seconds. Soon, the buffer overflowed, glowing an angry red. Doors piled up in a digital traffic jam. The (her favorite tool) lit up like a Christmas tree: Station: Welding Robot. Utilization: 178%.

This was her third attempt.

She realized her mistake. She had used the default “Normal Distribution” for the robot’s cycle time. But real robots sometimes stalled for 5 seconds to clean their nozzles. She double-clicked the welding robot, opened the tab, and changed the distribution to “Negative Exponential.” She added a 2% Failure Rate with a repair time of 10 seconds. tecnomatix plant simulation tutorial